510 m² Workspace Transformation Completed in 60 Days
3/5/20251 min read
Phenomenal Renovation Achieved in Just 30 Days at a Prominent High-Rise Office
An extraordinary renovation milestone was achieved within a landmark high-rise office building—510 square meters of vital workspace were transformed in just 30 days. This remarkable achievement became a benchmark not only for its speed, but also for its precision and execution quality.
The Strategy Behind the 30-Day Completion
Delivering a project of this scale within such a compressed timeline required a fully integrated 24/7 operational system with zero downtime.
Nonstop Multi-Workshop Fabrication
All custom furniture and built-in elements were produced simultaneously across three dedicated workshops operating 24 hours a day under a dual-shift system. This ensured a consistent, uninterrupted flow of finished components to the site.
24-Hour On-Site Installation
Installation teams worked in structured shifts around the clock, allowing complex assemblies to progress without pause. Continuous on-site operations preserved momentum and secured timely completion.
This synchronized production and installation system became the backbone of the accelerated delivery across multiple critical areas.
Transforming Nine Essential Areas in 30 Days
Within the first month, nine high-priority spaces were completed with uncompromised detailing and functionality:
Executive Meeting Room
VIP Lounge
Dining Area
Prayer Room
Main Corridor
Reception Lobby
Service Room
Two Dedicated Meeting Rooms
Integrated Connecting Door System
Each area required specific coordination, detailing accuracy, and sequencing to maintain both speed and quality standards.
Design Approach: Fresh, Efficient, Purpose-Driven
The project adopted a minimalist yet strategic design approach focused on clarity, efficiency, and operational performance. Material selection emphasized durability and refined aesthetics, while layout optimization enhanced circulation and workflow.
The revitalized 510 m² workspace now reflects a modern corporate environment—brighter, more functional, and aligned with the demands of high-performance operations.
Setting a New Benchmark in Accelerated Corporate Renovation
This project demonstrates that large-scale office transformations can be delivered within 30 days through disciplined logistics, structured dual-shift systems, and seamless coordination between fabrication and installation teams. Speed was achieved without compromising precision, craftsmanship, or finishing quality.












Operations Office :
Jl. Swadaya No.32,
Pd. Ranggon, Cipayung, Jakarta Timur
0823 2207 2021
marketing@uhsindonesia.id
© 2025 UHS Indonesia


Head Office :
Gedung Menara 165 Lantai 4,
Jl. TB Simatupang Kav 1, Jakarta
