BUMN Tower Pusat Jakarta's 510 m² Transformed into a State-of-the-Art Workspace in Just 60 Days!
5/8/20242 min read
Phenomenal Renovation Achieved in Just 30 Days at BUMN Tower Pusat, Jakarta
At the BUMN Tower Pusat (Central BUMN Tower) in Jakarta, an extraordinary renovation milestone was reached—a massive 510 square meters (sqm) of vital office space was transformed in an astounding 30 days. This remarkable feat, part of a broader project, became the benchmark for success, not only for its speed but also for its flawless execution.
The Secret to Success: A Relentless 24/7 Logistical Strategy
Achieving such a significant renovation within such a tight deadline required an aggressive yet brilliant work strategy—one that operated around the clock with zero downtime. Here’s how the team pulled it off:
Nonstop Triple-Workshop Fabrication: All custom furniture and built-in elements were simultaneously fabricated across three dedicated workshops, each running 24 hours a day on a two-shift system. This continuous production ensured that the site received a constant supply of finished goods.
24-Hour On-Site Installation: Installation teams worked relentlessly in shifts, ensuring that the complex installation process progressed at lightning speed without any pauses. The 24/7 operation on-site ensured that the project maintained momentum, delivering the transformed office space within the set timeframe.
This continuous-flow system became the backbone of completing the renovation of multiple areas in just a few weeks.
Transforming Nine Vital Areas in 30 Days
Within the first 30 days, the team successfully renovated the most crucial and high-spec areas within the office. This transformation proves that speed did not compromise the quality or precision of the work. The nine key areas that were refurbished and made highly functional within that month include:
Minister’s Meeting Room: The most sensitive area, requiring meticulous attention to detail.
VIP Lounge: A hospitality space demanding comfort and a professional atmosphere.
Dining Room
Musholla (Prayer Room)
Corridor
Lobby Resepsi (Reception Lobby): The office’s face, demanding a perfect first impression.
Ruang Servis (Service Room)
Two Meeting Rooms: Treated as two distinct areas for functional planning.
Integration of the Connecting Door: A complex integration often considered as a separate element of work.
Design Philosophy: Freshness and Efficiency
The renovation was guided by a clever design philosophy focused on freshness and efficiency. The minimalist design concept ensured that the installation process was simplified, while carefully selected materials guaranteed a premium finish. The result is a modern, efficient space that enhances workflow, improves comfort, and supports high productivity.
The entire 510 sqm area has been reimagined to serve the operational needs of the office while reflecting a modern aesthetic. With brighter lighting and functional layouts, the space is now prepared to support the high demands of daily operations.
A New Standard in Corporate Transformation
The BUMN Tower Pusat project in Jakarta has set a new standard for how corporate spaces can be transformed in record time. This achievement proves that with a perfectly coordinated logistical strategy—supported by relentless 24/7 efforts—massive office renovations can be successfully completed in as little as 30 days, without sacrificing quality or precision.



Jl. Swadaya No.32, RT.2/RW.3, Pd. Ranggon, Kec. Cipayung, Kota Jakarta Timur, Daerah Khusus Ibukota Jakarta 13860
Contacts
0823 2207 2021
info@email.com
© 2025 UHS Indonesia
Interior Contractor for Office